March 10, 2022 – IKSDP starts the daily service of distribution of drinking water to the community. It is water from the lake that has been purified by a modern plant located within the IKSDP Centre in Nyandiwa. This is how the penultimate phase of the “Drinking water for Nyandiwa” project is realized, which also includes a photovoltaic system for the energy needed to operate the system. 30% of the amount needed to cover the costs is still missing. This project is the result of the initiatives of the Calabria for Harambee network and other IKSDP sponsors. Thank you!